Wellesley College - Schneider Center

Wellesley, MA


Type of project: Renovation
Duration of Project: 7 months
Square footage: 16,000 sf
Partners: designLab Architects

Noteworthy: Shawmut conducted extensive window studies and mock-ups ahead of the critical project path. This allowed the entire team time to evaluate multiple options and ensure that window design and materials were the best possible fit. Multiple mock-ups of brick and roof restoration allowed for selection of the best possible products.

 

Recognition: Targeting LEED® Silver Certification; Boston Society of Architects Interior Design and Architecture Award

MORE PROJECTS